-
A
Backhoe weighing 8 tons is on top of a flatbed trailer and heading east
on Interstate 70. The extended shovel arm is made of hardened refined
steel and the approaching overpass is made of commercial-grade concrete,
reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a
crisscross pattern layered at 1 foot vertical spacing.
-
Solve:
When the shovel arm hits the overpass, how fast do you have to be going
to slice the bridge in half? Assume no effect for headwind and no braking
by the driver.
-
Extra
Credit: Solve for the time and distance required for the entire rig to
come to a complete stop after hitting the overpass at the speed calculated
above.
Click
Here for the answer.